Before Delivery: Site Preparation
Site prep for a container home is non-negotiable. An unprepared site causes level problems, drainage issues, and can make the expansion mechanism bind or not seal properly. Do this before your delivery date:
Ground Preparation
- Clear all vegetation, stumps, and debris from the placement area
- Grade the area level — container homes need a flat surface within 1 inch across the full length
- Install a compacted gravel pad (4–6 inches of crushed stone) for drainage
- Mark the exact placement position with stakes
Foundation Options
Concrete pier blocks at each corner and midspan are the most common foundation for container homes. Space piers no more than 8 feet apart. Use adjustable steel post bases so you can fine-tune level after placement. A full concrete slab works but is overkill for most temporary or semi-permanent installations.
Access for Delivery
Container homes arrive on flatbed trucks with a crane or tilt-deck trailer. You need: a clear access path at least 14 feet wide and 14 feet tall, a firm surface for the delivery truck (gravel or concrete — soft ground will get the truck stuck), and enough clearance for the crane boom if using a crane delivery.
Delivery Day
- Have 2–3 helpers on site — you'll need people to guide the container into position
- The container is lowered onto your foundation — direct the driver carefully
- Check level immediately using a 4-foot level on both axes
- Adjust post bases or shim as needed before releasing the crane
- Secure the container to the foundation before the delivery crew leaves
Expansion Process
Most expandable units use one of two mechanisms: manual hand cranks (common on budget units) or hydraulic rams (common on premium units). The manufacturer's instructions are specific to your model — follow them exactly. Generally:
- Remove all shipping locks and transport braces (these are critical — missing one will prevent expansion)
- Start expansion evenly — if panels can be extended independently, move each side in small equal increments
- Once fully extended, engage all expansion locks
- Install weatherstrip seals in all panel joints per the manual
- Test all doors and windows — they should open and close freely
Utility Hookup Sequence
- Electric first — you'll need power for tools and lighting during interior work
- Water second — connect supply line and test for leaks before finishing walls
- Septic/sewer third — connect drain lines and test all fixtures
- HVAC last — install mini-split or connect to HVAC system once interior is sealed
Adjustable Steel Post Base
For leveling container on pier foundation. Adjusts 3 inches.
View on Amazon →Extension Cord 100ft 12AWG
Heavy-duty extension cord for temporary power during setup.
View on Amazon →Get Tiny Home Tips Free
New guides, product picks, and travel deals in your inbox.